• Kentwood Reconfiguration


    To prepare for the 2004-2005 school year, several additions were made to Kentwood High School. In addition to an expanded cafeteria, Kentwood added a 50,000 square foot classroom building and a new auxiliary gymnasium and weight room facility. A rendering of the new classroom building can be seen in the foreground of the picture below. The new gymnasium is to the right of the classroom building, behind the existing building.

    Kentwood Configuration